Road Work Report

 Road Report for Monday 3/3/2014

Inclement weather still persists.

When road work does start on Tuesday we will need all cars removed from turn 1  on the lower side of the switch back so that dump trucks can turn around there and back up the hill towards turn 2.

We want to get ditching and road surface repairs done between turns 1 and 2 so we don't lose that portion of the road.

The goal will be to get a temperary emergancy road open for residents to get  supplies in and vehicles out. Be prepared once road is open, the slide could close  again if we get torrential rains.

We are planning for a long term solution, but that takes time and funds. We want to have a well thought out plan. More on that, this Saturday morning.  Please send in you special assessments now.